US: CertainTeed plans to spend US$1.1m towards installing recycling equipment at its Palatka gypsum wallboard plant in Florida. The upgrade will increasing the recycled content of its wallboard products manufactured at the unit by 18,000t/yr while also reducing the site’s CO2 emissions by 2260t/yr.
The new recycling equipment at the Palatka plant will work by grinding the waste gypsum and waste paper down into fine particles, allowing the plant to capture and internally recycle the materials, which are sorted and then reintroduced to the production process at the plant. The kit will be powered by electricity and will replace older machines currently powered by diesel, lowering the plant’s Scope 1 Emissions from its operations. Additionally, by consuming more recycled gypsum, the plant will become less reliant on feedstock that is shipped to the site from external sources, allowing the unit to also reduce Scope 3 Emissions associated with transporting the feedstock.
Jay Bachmann, the Vice President and General Manager of CertainTeed Interior Products Group, said, “The new technology in Palatka will allow us to increase the recycled content in our products, reduce our carbon CO2 at the plant, and strengthen our operations at a time of unprecedented consumer demand for gypsum wallboard in the south-eastern US.”
The investment at the Palatka plant follows similar investments that will increase the recycled content of wallboard made at CertainTeed’s wallboard plants in Silver Grove in Kentucky and Nashville in Arkansas. Parent company Saint-Gobain continues to roll out its global ‘Grow and Impact’ strategy, which includes reducing waste and increasing recycling efforts at its manufacturing sites.